BELHAR
STUDENT
RESIDENCE
Univeristy of Western Cape
Work Completed:
Responsible for the design of hot water generation plant, domestic water storage, water reticulation, and internal drainage for the 2780 bed Student Residence.
Year: 2019
Client: Private
Project Value: 13.8M